高大丰满熟妇丰满的大白屁股,国产边打电话边被躁视频,99热精品久久只有精品,日韩欧无码一二三区免费不卡

Key Projects

Key Projects

Home > CORPORATE BRANDS > Key Projects

Zinc Smelting Project
DATE:16 Nov 2017 瀏覽次數:1
+ . -

Ø The Chifeng NFC Kumba Hongye Zinc Smelting Project includes four phases with total production capacity of 230,000 t/a zinc ingot, 2,400 t/a electrolytic copper and 350,000 t/a sulfuric acid. The project production capacity takes a lead in the industry in China and the equipment is also advanced in the same scale project in China. At the same time, the project also creates a precedent in China of recovering copper from purification residue to obtain cathode copper, as well as a new profit growth point for zinc smelting enterprises. In addition, the process recovers silver from leached residue with floatation to obtain silver concentrate and recovers zinc through extraction from solution after flotation treatment, which also increased recovery of valuable metals. ENFI undertook all of the design and adopted the patent intellectual property technology of hot acid leaching -jarosite process, which is jointly owned by ENFI and Chifeng NFC Kumba Hongye Zinc Corporation. The technology is innovative in China and internationally advanced. After over 20 years, the practical production proved that the technology is sophisticated and reliable, featuring stable production, low operating costs, high rate of first class products and good economic returns. The technical and economic indicators of production management of the enterprise are among the international and domestic advanced level. The Phase IV works won the first prize of 2013 Outstanding Engineering Design Award (provincial and ministerial level), and the new technology for copper recovery from electrolyte purification residue of zinc hydrometallurgical process won a second prize in 2012 China Nonferrous Metals Industry Science and Technology Award.  

    

Ø The Zinc Smelting Project of Inner Mongolia Xing'an Copper & Zinc Smelting Co., Ltd., was designed by two phases. The capacity of Phase I as an EPC project is 100,000 t/a  with adoption of jarosite process. It was put into production in July 2009. 100,000 t/a zinc smelting capacity is added to Phase II project. EPC project includes waste heat boiler, electrics and instrumentation and acid-making tail gas treatment. The process is hot acid leaching - iron removal by spraying and focuses on the treatment of leached residue. The production capacity after completion of all works can reach 250,000 t/a. The Phase II project is under construction. 

Ø The Zinc Smelting Project of Bayannaoer Zijin Nonferrous Metal Co., Ltd. consists of two phases with the design capacity of 200,000 t/a in total and actual output of 220,000 t/a. ENFI undertook design of the project. Phase I has a capacity of 100,000 t/a with adoption of hot acid leaching - jarosite process, which was put into production in May 2006; Phase II has a capacity of 100,000 t/a with adoption of the same process as that in Phase I, which was put into production in September 2009.

Ø Comprehensive Zinc Resource Utilization Project of Baiyin Nonferrous Metals Company Northwest Lead & Zinc Smelting Plant (EPCm), is ENFI's first single-series 150,000 t/a electrolytic zinc project with independent intellectual property. Roasting - hot acid leaching - jarosite zinc hydrometallurgy process is used for the zinc system. The fluidized-bed roaster with an area of 152 m2 is the largest zinc smelting roaster in the world to date. The project, as a zinc smelting demonstration project with special funds support from the Ministry of Industry and Information Technology of the People's Republic of China, ranks the highest standard both in terms of technical level and energy conservation and emission reduction, taking a lead in zinc smelting and also representing outstanding contribution of ENFI to zinc smelting industry. The project is under construction currently.

Ø For the Zinc Smelting Project by Atmospheric  Oxygen-enriched Direct Leaching with Zinc Leaching Residue Techniques of Zhuzhou Smelter Group (EPC), has a design capacity of 130,000 t/a. The oxygen-enriched direct leaching - goethite process is adopted. This process removes the acid-making system and can treat zinc-containing waste residues, and improves zinc recovery by addition of enriched oxygen. This process is among the international latest zinc hydrometallurgy technologies. The project has a purification process of arsenic salt solution with design capacity of 320,000 tons. It is the arsenic salt solution purification system with the maximum capacity of single series applied in zinc smelting system in China. The project was put into full operation in September 2009.

        

Ø The Huize Electrolytic Zinc and Residue Comprehensive Utilization Project of Yunnan Chihong Zinc and Germanium Company Limited reaches the total capacity of 150,000 t/a electrolytic zinc product. The international advanced equipment like large electrolytic tanks, 3.2 m2 cathode sheet, and large automatic cranes are applied in the project. It is a zinc electrolysis plant with the maximum capacity in China. Residues yielded by various systems of the project are recycled and brings the advantages of establishing joint venture for lead and zinc smelting into full play, which builds another new and green lead and zinc smelting enterprise for Yunnan Chihong Zinc and Germanium Company Limited.

    

主站蜘蛛池模板: 中文字幕乱码亚洲影视| 东京热无码av一区二区| 亚洲最大成人网 色香蕉| 国产成人av无码永久免费一线天 | 一本之道av不卡精品| 亚洲精品人妻| 永久免费无码日韩视频| 亚洲精品夜夜夜| 亚洲ⅴ欧洲第一的日产av| 国产精品亚洲一区二区三区在线| 亚洲国产成人精品无码区花野真一| 精品国产一区二区三区久久久狼| 六月丁香综合在线视频| 亚洲人成人影院在线观看| 久久av无码精品人妻系列果冻| 国产成人精品成人a在线观看| 国产精品 自在自线| 国产播放隔着超薄丝袜进入| 尤物yw午夜国产精品大臿蕉| 欧美啪啪| 日日麻批免费40分钟无码| 夜夜揉揉日日人人| 久久人人97超碰国产精品| 性生交大片免费看女人按摩摩| 玩弄japan白嫩少妇hd| 欧美日韩亚洲国内综合网| 亚洲中文字幕人成影院| 久99久热只有精品国产15| 国产福利日本一区二区三区| 欧美又大粗又爽又黄大片视频| 黄a大片av永久免费| 99精品丰满人妻无码a片| 97伦伦午夜电影理伦片| 久久久精品妇女99| 国内免费视频成人精品| 人妻少妇精品一区二区三区 | 国产精品午夜成人免费观看| 人妻巨大乳挤奶水hd免费看| 午夜嘿嘿嘿在线观看| 狠狠色噜噜狠狠狠狠97| 高清无码爆乳潮喷在线观看|